Source of the Nile Bridge opens in Jinja
A new 525-metre cable-stayed bridge across the Victoria Nile replaces the 1954 Nalubaale Bridge as the main road link on Uganda's Kenya-facing trade corridor.
Delivered by Uganda National Roads Authority (UNRA), shared for context. This is not an NPPU-procured project.
President Yoweri Museveni commissioned the new Source of the Nile Bridge in Jinja on 17 October 2018, replacing the 1954 Nalubaale Bridge as the main crossing of the Victoria Nile on the road route to Kenya.
The 525-metre cable-stayed structure, built between January 2014 and its 2018 opening, has a longest span of 285 metres. It was constructed by Japan's Zenitaka Corporation and South Korea's Hyundai Engineering and Construction Company, with roughly 800 workers involved, nine in ten of them Ugandan. Around 80 percent of the estimated $125 million cost was financed through a low-interest Japanese government loan.
Officials at the time framed the bridge as both an economic corridor upgrade for Uganda's Kenya-facing trade route and a potential tourism draw given its scale and lighting design.